The Öresundsbron bridge (tunnel section) | Print |  E-mail
The fixed link between Skåne and Zealand measures almost 16 km in total, and comprises a bridge section, an artificial island and a tunnel.

Öresundsbron The tunnel section, which extends 4 km from the artificial island to the Danish mainland, has a comprehensive supply air ventilation system. Our long experience and expertise in the manufacture and design of duct heaters was an important factor in our being selected as a supplier to the project. The pillars, which can be seen from far away, are the tallest structures in Sweden, measuring 204 metres. The entire link is a combined road and rail link between two expanding regions. The bridge was opened to the general public in the summer of 2000.

Image
 
© 2008 VEAB Heat Tech AB
The documents and related graphics published on the services could include technical inaccuracies or typographical errors.
Changes are periodically added to the information herein. VEAB Heat Tech AB may make improvements and/or changes in the
product(s) and/or the brochure(s) described herein at any time without notice.
VEAB Heat Tech AB, Box 265, SE-281 23 Hässleholm, Phone: +46(0)451-485 00, Fax: +46(0)451-410 80